友情链接:2 澳门威尼斯人官网 澳门新葡京官网 澳门新葡京官网 澳门百家乐手机版 澳门百家乐官网 百家乐网页游戏 澳门足球博彩 博彩公司排名 博彩导航 赌博网 澳门网上赌博 最新赌博技巧 澳门新葡京官网 澳门新葡京棋牌 澳门新葡京棋牌手机版下载 澳门新葡京棋牌游戏 澳门新葡京娱乐场官网 澳门新葡京棋牌官网 澳门新葡京棋牌手机版 澳门新葡京线上娱乐 澳门新葡京棋牌客户端 澳门新葡京线路检测中心 葡京赌场官网 澳门赌场攻略 赌场官网 澳门新葡京娱乐 澳门新葡京开户 澳门新葡京娱乐 威尼斯人 威尼斯人开户 澳门威尼斯人娱乐 澳门赌场网 澳门新葡京娱乐场官网下载 澳门新葡京手机网址 澳门新葡京下载 澳门新葡京棋牌app 澳门新葡京全网返利 澳门新葡京客户端下载 澳门新葡京娱乐场手机网址 澳门新葡京真人游戏 澳门新葡京赌博 澳门新葡京真人视讯 网上百家乐 澳门新葡京娱乐 新葡京官网 新葡京免费开户 澳门新葡京免费开户 澳门新葡京客户端 新葡京免费注册 澳门新葡京免费注册 新葡京平台 澳门百家乐官方网站 百家乐策略 百家乐游戏 网页百家乐 百家乐技巧 赌博游戏 赌博技巧 赌博网 现金赌博 澳门赌博技巧 澳门新葡京官网 澳门线上新葡京 澳门线上新葡京注册 澳门新葡京娱乐 澳门新葡京官网 澳门线上新葡京 澳门线上新葡京注册 澳门新葡京娱乐
Installation Guide-Heat pump knowledge-Guangdong Folansi Energy Saving Equipment co.,Ltd
TEL:+86-20-89391272    E-mail:info@folansi.com     English | Chinese
Recommend Product
Contact us
Guangdong Folansi Energy Saving Equipment co.,Ltd
TEL:(86) -020-89391272
FAX:(86) -020-85105335
WEB:www.chinafolansi.com
E-MAIL:info@folansi.com
      
Heat pump knowledge

Installation Guide

1、Place selection of installation 
Heat pump
1).Heat pump should be installed in a large space, and have good air flow condition.
2.Air inlet and outlet must be a clear road, the distance from barriar to inlet and outlet must be longer than 2m.
3.Set drain ditch or drain outlet, so that can drain water easily.
4.The installation base or braket must be firm, make sure heat pump work balancely.
5.Make sure heat pump is vertical, can't be slanted.
6.Don't install heat pump at the place in where there is plenty of pollutional and corrosivee gas or sand or falllen leaves.
7.The installation place can't be near nflammable, flammable thing or fire.

2)、installation
The installation base can be concrete construction, or steel bracket, and must use antivibration rubber pad,  And the surface should be smooth. 
The design of installation base can be according to heat pump weight.
The heat pump bottom should be fixed by bolt.


2、pipe connection
The drain pipe and overflow pipe should be installed near drain ditch or drain outlet, easy to drain, and install drain water valve on drain pipe.
Before magnetic valve there should be service valve on water pipe.
If use plastic pipe (such as PPR pipe or ABS pipe), users should consider pipe expand and contract problem between heat pump and water tank.
Water supply valve and cut-off valve maybe need insulation (according to local weather condition), avoid frost crack.
 
3、water pipe system installation
Water pipe should be straight, and the arrange should be reasonable, reduce bend as little as possible. Reduce the water pipe resistance.
There can't be leaking at any place of pipe.
After all equipments and pipes installation finished, users should test water pressure, and drive air out, drain dirty out, make sure water cycle system is clean. After confirm there is not any problem, then insulate all hot water pipes.

4、power supply wiring
220V heat pump use single phase power supply, 380V heat pump use three phase power supply, wire line is 3phase 4lines, A B C connects live line, N connects null line, E connect earth. Be sure not to connect N line to live line of power supply. 
1).When repairing, please turn power supply at "off" side.

2).Power supply connecting process:make sure a equipment power supply is cut off before it's installation is finished. Install power supply switch at suitable place, Use rubber hole for wiring line in electric box. 
Power supply demand:
220V rated voltage±10%
380V rated voltage±10%
frequency:50Hz rated frequency±2%
3).if power supply fluctuation is out of demand, please don't start your heat pump.


Home|Products|About us|Projects|Inquiry|Site Map|Contact us
  
Folansi Energy Saving Equipment co.,Ltd.
E-mail: info@folansi.com skype:cnfolansi
Tel: +86-20-89391272 Copyright @ Folansi 2010